Onshore

Terminal pipeline tie-in

TERMINAL PIPELINE TIE-IN

Houma, Louisiana


Project included the construction, installation, and tying-in of a 24-inch pipe connection from its specified NGL location within the Houma Station and the back manifold and fabricating and installing a 12-inch connection from the buried 12-inch 300# flange to its specified NGL Location within the Houma Station.


Learn more about our parent company

Morrisonenergy.com