Project required pipeline re-routes and adjustment activities to accommodate the US Army Corp of Engineers’ (USACE) Floodwall construction project.

Relocation and adjustment of two 12-inch pipelines and a relocation adjustment of one 16-inch pipeline on the levee.  Challenges that were under considerations included congested corridors, environmental issues, soil issues and public & government affairs.

Morrison’s performance on this project was put together very well and considered to be exceptional from the bid proposal process through the project execution planning through the project’s final acceptance. I, along with the Client, was very impressed on the manner of documentation with the job planning and project procedures that were utilized to bring this project in on budget and schedule.