The System consisted of seven lateral pipelines and three trunk lines with a combined total length of 244.8 miles. The diameters of the lateral lines range from 12″ to 30″. Water depths up to 306 fsw.
- Diving operations to support pipeline pigging and abandonment operations.
- Multiple pipeline abandonments in various locations
- Platform demolition
- Procurement
- Project Management
- Undefined Scopes
- Integrated Project
- Technical capacity