Morrison fabricated and installed the barrels for a condensate stabilizer expansion project off the coast of Louisiana.
Morrison pre-fabricated the 48” x 600’ barrels and delivered these barrels to the facility via barge and roller system. By utilizing the waterways rather than the roadways, longer sections could be prefabricated.
- Civil work
- Foundation and pilings
- Structural Fabrication
- Equipment Erection